Astley High School – Seaton Delavel

Barr + Wray were appointed by BAM Construction to supply and install the 25m Myrtha Pool, a Pool Pod 3.0 and advanced filtration water treatment plant.

Project Details

Following the successful completion our initial engineering consultancy, Barr + Wray were appointed by BAM Construction to supply and install the aquatic facilities. This encompassed the 25m Myrtha Pool, a Pool Pod 3.0 and comprehensive water treatment plant. The advanced filtration system integrated Liqtech Ceramic Micro Filtration (CMF) technology, Grundfos pumps, and a Kuntze chemical controller.

This use of modern construction methods and intelligent technology is fully aligned with the building’s contemporary design, guaranteeing a clean, reliable, and safe swimming environment for years to come.

Location: England

Project Type: Leisure + CompetitionSchool + Hydrotherapy