B+W are pleased to have successfully completed the water filtration and feature hydraulics at the new South Lake Leisure Centre in Craigavon, Northern Ireland.
Our package included the design, supply, installation and commissioning of the 50m swimming pool, learner pool, leisure pool and vitality pool filtration water treatment systems. The main pool has two movable floors and booms and the vitality pool also includes stainless steel attractions.