The Drammensbadene indoor swimming pool complex has been constructed in Drammen adjacent to the existing outdoor swimming facility. The new complex opened to the public in September 2008 and will be the largest swimming pool complex in Norway, where it will serve a population of 60,000 people.
B+W was appointed via our partner Malmsten of Sweden to design and construct a 3-chamber seamaker wave machine with a 55-kilowatt fan capable of producing five different wave patterns. This was installed within the pool complex and commissioned two months ahead of schedule.
The wave machine is fully operational and on the soft opening day was certainly the main attraction within the development especially with the younger generation.