B+W are pleased to have completed the pool installation at Queensferry High School, working alongside Morrison Construction. We were contracted for the supply, installation and commissioning of the filtration water treatment plant for a new 25m, 6 Lane pool. B+W also designed and installed the pool utilising Myrtha technology. The new School was used as a pilot project which received funds through the Scottish Futures Trust to ensure a low carbon design. By opting for the Myrtha stainless steel pool structure, this saves over 50% CO2 when compared to traditional concrete methods. We are proud to be part of this special project.